Skip to main content

Table 1

From: CVP does not reflect changes in preload when optimal PEEP is determined

 

T26

Tep

P

CI (l/min/m2)

3.6 ± 0.9

4.2 ± 1.1

0.003

SVI (ml/min/m2)

32 ± 8

36 ± 9

0.013

ITBVI (ml/m2)

794 ± 188

870 ± 423

0.279

CVP (mmHg)

24 ± 6

19 ± 5

0.001