Base case ICER calculations | Threshold analysis*: probability of cost-effective at alternative values of willingness to pay for a QALY (%) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Mean total cost (£) | Incremental cost (£) | Mean QALY | Incremental QALY | ICER (£/QALY) | £10, 000 | £20, 000 | £30, 000 | £50, 000 | |
Fluid loading | 10,373 | 0.3527 | 84.4 | 86.5 | 89.4 | 92.0 | |||
Fluid control | 11,739 | -1,366 | 0.3175 | 0.0352 | Dominated | 15.6 | 13.5 | 10.6 | 8.0 |
Adjusted differences (95% CI; P- value)* | -2,047 (-6,947 to 2,854; P = 0.413) | 0.0431 (-0.0171 to 0.1033; P = 0.161) |